Table 5 Comparison cost of each drain assessment method

From: Detecting peatland drains with Object Based Image Analysis and Geoeye-1 imagery

Methods

 

Amount

Rate (€)

Total cost (€)

Manual digitisation

Labour (hours)

583

17a

9951

Imagery

1

1256

1256

Software cost (per day)

97

2.6b

252

Total

  

11,459

OBIA

Image analysis labour (hours)

120

17a

2047

Imagery

1

1265

1265

Software cost (per day)

20

4.1c

82

Surveyor labour (hours)

16

44

700

Field assistant labour (hours)

16

14

224

Equipment (per job)

19

Lodgings and subsistence

1

125

125

Mileage (km)

576

0.59

340

Car hire

1

50d

50

Total

  

4852

Field survey

Labour surveyor (hours)

124.2

44

5432

Labour field assistant (hours)

124.2

14

1738

Equipment (per job)

144

Lodgings and subsistence

16

125

2000

Mileage (km)

1060

0.59

626

Car hire

1

750e

750

Total

  

10,690

  1. a €17/h is calculated from the Irish Universities Association research pay scale for a research assistant on point 10 of the salary scale working
  2. b, cSoftware cost per day (assuming a 3 year depreciation and the number of workdays as a ratio of 3 years of workdays as the proportion to cost to the calculation e.g. if used for 15 days, then [15 / (260 × 3)]*2000] = cost of software)
  3. d, eCar hire for 2 and 16 days, respectively